Home / Capabilities / SAP Solutions / SAP Integration Suite
SAP Solutions

One integration platform for SAP and everything else.

Most SAP landscapes run on a patchwork of integration tools: SAP PI/PO alongside TIBCO, webMethods, MuleSoft, Boomi, BizTalk or Oracle. Each one has its own license, skills and monitoring. We consolidate them onto SAP Integration Suite, the platform your SAP roadmap already points to, in planned, tested waves.

Why now

What's happening to each platform.

PlatformWhat's happening
SAP PI/PO 7.5Mainstream maintenance ends 31 Dec 2027; extended maintenance to 31 Dec 2030
Microsoft BizTalk Server2020 is the final version; end of support 9 Apr 2030
Oracle SOA Suite 12.2.1.4Premier Support ends 31 Dec 2026; Extended Support to Dec 2027
Informatica PowerCenter 10.5.xEnd of support 31 Mar 2026
TIBCO BusinessWorks 5Specific versions retiring (5.15.x on 30 Nov 2026); 5.16.1 long-term release supported to 2030
webMethods, MuleSoft, BoomiActive products. The reason to move is consolidation and cost, not deadlines

Last verified 1 November 2026. Dates change; we re-check them before every engagement. All SAP deadlines →

The platform

What SAP Integration Suite covers.

Cloud Integration · API Management · Event Mesh and Advanced Event Mesh · Integration Advisor and Trading Partner Management (B2B/EDI) · Open Connectors · Edge Integration Cell, which runs integrations inside your own network.

Our integration services

Nine services, one platform.

ServiceWhat it is
Integration Landscape Assessment (fixed price)Inventory every interface on PI/PO or third-party middleware, map dependencies and owners, rank risk, and deliver a costed wave plan.
PI/PO → Integration Suite migrationWave-based migration using SAP's Migration Tooling plus targeted redesign, with regression testing and PO decommissioning.
Third-party middleware → Integration SuiteA repeatable method to rebuild and test interfaces from TIBCO, webMethods, MuleSoft, Boomi, BizTalk, Oracle SOA and Informatica.
Edge Integration Cell / hybrid integrationSet up SAP's on-premise runtime for flows that must stay inside your network.
B2B / EDI modernizationMove EDI partners (X12, EDIFACT, AS2) and e-invoicing flows to Trading Partner Management.
API ManagementPublish, secure and govern APIs for S/4HANA and partners.
Event-driven integrationReplace polling and batch IDocs with business events on Event Mesh.
Neo → Cloud FoundryMove existing Cloud Integration tenants off the retiring Neo environment.
Managed integration operationsMonitoring, incident handling, certificate rotation and small changes on a monthly retainer.
No big-bang cutover

Old and new run side by side.

We move interfaces in waves. A pilot wave proves mappings, security, connectivity and monitoring first. Every wave is regression tested, and your current platform keeps running until each wave is proven. Only then is it decommissioned.

How every integration migration runs

The BOND Method, for integration.

B

Blueprint

Inventory, dependency map, a decision per interface (move as-is, redesign or retire), costed wave plan.

O

Orchestrate

A pilot wave to prove mappings, security, connectivity and monitoring.

N

Navigate

Migrate in waves with automated regression testing; the old platform keeps running until each wave is proven.

D

Deliver

Cutover, decommission the old platform, hand over runbooks or move into managed operations.

Our integration work draws on 15 years of SAP integration delivery, from PI/PO through to Cloud Integration.

Count your interfaces before you commit.

A fixed-price Integration Landscape Assessment gives you the inventory, the risks and a costed wave plan.