SAP Integration Suite
Facing the Oracle SOA 12c support cliff?
The 12c deadline forces a choice between upgrading to 14c and re-platforming. For SAP-heavy landscapes, that's a natural moment to consolidate onto SAP Integration Suite.
Where you are today
The dates that matter.
31 Dec 2026Oracle SOA Suite 12.2.1.4 Premier Support ends.
Dec 2027Extended Support ends; Oracle has signaled a paid "Market Driven Support" option beyond 2027.
14.1.xFusion Middleware 14.1.x is supported to 2030 (Premier) and 2033 (Extended).
Last verified 1 November 2026. Dates change; we re-check them before every engagement. All SAP deadlines →
Why customers move
Why move now.
- The 12c deadline forces a decision either way.
- Upgrading keeps two integration platforms in an SAP-heavy landscape.
- BPEL and OSB skills are getting harder to find.
How it maps
Where it lands on SAP Integration Suite.
BPEL processes and OSB pipelines → Cloud Integration · Oracle B2B → Trading Partner Management
Complexity: High.
How we migrate
The BOND Method, for integration.
B
Blueprint
Inventory and a decision per interface: move as-is, redesign or retire.
O
Orchestrate
A pilot wave to prove mappings, security and monitoring.
N
Navigate
Waves with regression testing; the old platform keeps running in parallel.
D
Deliver
Cutover, decommission and handover.
What you get
A finished move, not a half-way house.
- A full interface inventory.
- A costed wave plan.
- Rebuilt and tested interfaces on Integration Suite.
- Documentation and runbooks.
- The option of managed operations afterwards.
Count your interfaces before you commit.
A fixed-price Integration Landscape Assessment gives you the inventory, the risks and a costed wave plan.